
Overview
UAVOS’ family of parachute systems has been specially designed both for UAV recovery and as a safety measure that can be used in case of UAV catastrophic failure. UAVOS parachutes benefit from an automatic cord-cutter system that releases the parachute once the air vehicle has landed, minimizing the potential for damage due to high wind. Hand-sewn from high-grade parachute materials, the parachutes feature a variety of designs that offers the best compromise between packed volume and parachute drag coefficient, providing a safe and low-impact landing for your drones and payloads. The system has been thoroughly tested on UAVOS’ drones.
Features
Key advantages of UAVOS drone parachute systems are:
- High speed-range for initial phase of deployment: 20km/h to 220km/h tested, extension feasible
- Moderate G-load throughout total deployment-range due to configurable slider system: standard <6g
- Quick stabilization after deployment
- Low tendency of oscillation
- Extreme low weight and dimensions resulting in low effect on payload: standard 1.5-2.0kg with 4-6.5 liter volume
- Re-useable: 10+ deployments possible
- Development and production in accordance with aeronautical engineering regulations
- Verification of required parameters through special measuring equipment and video documentation during airdrop-tests
- Low adaptation and development efforts while in design phase to consider specific requirements.
Choose a system
Twelve systems, in order of the load they carry.
| System | UAV type | RS type | Commissioning principle | Maximum allowable load, kg | Weight, kg | Parachute compartment LxWxH, mm | Ballistic compartment LxWxH, mm |
|---|---|---|---|---|---|---|---|
| 10 System of Standard Parachute Landing | airplane | standard | self-extracting | 15 | 0.3 | 300x120x40 | – |
| 10 Parachute Systems | airplane / helicopter / multi-rotor | standard / emergency | ballistic | 15 | 0.8 | 142x130x130 | – |
| 15 Parachute Systems | airplane / helicopter / multi-rotor | standard / emergency | ballistic | 20 | 0.7 | 142x130x130 | – |
| 25 Parachute Systems | airplane / helicopter / multi-rotor | standard / emergency | ballistic | 35 | 1.3 | 136x136x175 | — |
| 50 System of Standard Parachute Landing | airplane | standard / emergency | self-extracting | 60 | 2.5 | 260x220x80 | – |
| 50 Parachute Systems | airplane / helicopter | standard / emergency | ballistic-exhaust | 60 | 3 | 260x220x80 | 214x80x70 |
| 75 System of Standard Parachute Landing | airplane | standard / emergency | self-extracting | 80 | 2.7 | 300x240x80 | – |
| 75 Parachute Systems | airplane | standard / emergency | ballistic-exhaust | 80 | 3 | 300x240x80 | 214x80x70 |
| 100 Parachute Systems | airplane / helicopter | emergency | ballistic-exhaust | 120 | 3.5 | 350x300x100 | 214x80x70 |
| 200 Parachute Systems | airplane / helicopter | emergency | ballistic | 220 | 4.5 | 300x300x275 | – |
| 350 Parachute Systems | airplane / helicopter | emergency | ballistic | 360 | 5.7 | 210x210x510 | – |
| 1000 System of Standard Parachute Landing | airplane | emergency | ballistic-exhaust | 1300 | – | – | – |
Specifications
Deployment
The UAV’s speed and altitude when the system is triggered, and the descent.
| System | Max. speed without a braking parachute, m/s | Max. speed with a braking parachute, m/s | Max. speed, km/h | Min. response time, s | Min. altitude at minimum speed, m | Max. overload at max. load, g | Descent rate at max. load, m/s |
|---|---|---|---|---|---|---|---|
| 10 System of Standard Parachute Landing | up to 16 | – | 20 | 3 | 50 | 1.2 | up to 4 |
| 10 Parachute Systems | up to 33.3 | – | 0 | 2 | 50 | 6 | up to 6 |
| 15 Parachute Systems | up to 20 | – | 0 | 1 | 10 | 6 | up to 6 |
| 25 Parachute Systems | up to 33.3 | – | 0 | 3 | 50 | 6 | up to 6 |
| 50 System of Standard Parachute Landing | up to 33.3 | up to 300 | 5 | 3 | 50 | 6 | up to 6 |
| 50 Parachute Systems | up to 33.3 | up to 300 | 5 | 2 | 50 | 6 | up to 6 |
| 75 System of Standard Parachute Landing | up to 10 | up to 300 | 20 | 1.5 | 70 | 12 | up to 6 |
| 75 Parachute Systems | up to 33.3 | up to 300 | 20 | 1.5 | 70 | 12 | up to 6 |
| 100 Parachute Systems | up to 33.3 | up to 110 | 5 | 3 | 80 | 10 | up to 6 |
| 200 Parachute Systems | up to 97 | – | 0 | 3 | 50 | 5 | up to 6 |
| 350 Parachute Systems | up to 97 | – | 0 | 4 | 200 | 5 | up to 6 |
| 1000 System of Standard Parachute Landing | up to 100 | up to 300 | 50 | 5 | 500 | 16 | up to 6 |
Parachute and mounting
| System | Parachute area, m² | Pilot chute | Slider | Container | Lanyard attachment points on the UAV | Lock that can be installed |
|---|---|---|---|---|---|---|
| 10 System of Standard Parachute Landing | 6.3 | stabilizing | no | – | 4 | No. 1 |
| 10 Parachute Systems | 6.5 | – | no | hard | 1 | No. 2 – No. 3 |
| 15 Parachute Systems | 7 | – | no | hard | 1 | No. 2 – No. 3 |
| 25 Parachute Systems | 15 | – | no | hard | 1 | No. 2 – No. 3 |
| 50 System of Standard Parachute Landing | 35 | exhaust / brake / stabilizing | yes | soft/hard | 1-4 | No. 3 |
| 50 Parachute Systems | 35 | exhaust / brake / stabilizing | no | soft/hard | 1 | No. 3 |
| 75 System of Standard Parachute Landing | 35 | exhaust / brake / stabilizing | no | soft | 1-4 | No. 3 |
| 75 Parachute Systems | 35 | exhaust / brake / stabilizing | no | soft | 1-4 | No. 3 |
| 100 Parachute Systems | 42 | exhaust / brake / stabilizing | no | soft | 1 | – |
| 200 Parachute Systems | 0 | – | yes | hard | 1-4 | – |
| 350 Parachute Systems | 56 | – | yes | hard | 1 | – |
| 1000 System of Standard Parachute Landing | 280 | exhaust / brake / stabilizing | yes | hard | 1-4 | – |
Actuation
| System | Actuation | Supply voltage, V | Charge actuation current, not less than, mA |
|---|---|---|---|
| 10 System of Standard Parachute Landing | – | – | – |
| 10 Parachute Systems | application of power supply | 5 | 500 |
| 15 Parachute Systems | application of power supply | 5 | 500 |
| 25 Parachute Systems | application of power supply | 5 | 500 |
| 50 System of Standard Parachute Landing | – | – | – |
| 50 Parachute Systems | application of power supply | 5 | 500 |
| 75 System of Standard Parachute Landing | – | – | – |
| 75 Parachute Systems | power supply | 5 | 500 |
| 100 Parachute Systems | power supply | 5 | 500 |
| 200 Parachute Systems | power supply | 5 | 500 |
| 350 Parachute Systems | power supply | 5 | 500 |
| 1000 System of Standard Parachute Landing | power supply | 5 | 500 |
Service and operating conditions
| System | Parachute resource, applications | Charge resource, times | Cartridge tube resource, times | Service life, months | Repacking interval, days | Operating temperature |
|---|---|---|---|---|---|---|
| 10 System of Standard Parachute Landing | 50 | – | – | 12 | 60 | -20°C/+30°C |
| 10 Parachute Systems | 30 | 1 | 3 | 12 | 60 | -40°C/+50°C |
| 15 Parachute Systems | 30 | 1 | 3 | 12 | 60 | -40°C/+50°C |
| 25 Parachute Systems | 30 | 1 | 3 | 12 | 60 | -40°C/+50°C |
| 50 System of Standard Parachute Landing | 30 | – | – | 12 | 60 | -20°C/+30°C |
| 50 Parachute Systems | 10 | 1 | 3 | 12 | 60 | -40°C/+50°C |
| 75 System of Standard Parachute Landing | 30 | – | – | 12 | 60 | -20°C/+30°C |
| 75 Parachute Systems | 10 | 1 | 3 | 12 | 60 | -40°C/+50°C |
| 100 Parachute Systems | 10 | 1 | 3 | 12 | 60 | -40°C/+50°C |
| 200 Parachute Systems | 10 | 1 | – | 12 | 60 | -40°C/+50°C |
| 350 Parachute Systems | 10 | 1 | – | 12 | 60 | -40°C/+50°C |
| 1000 System of Standard Parachute Landing | 5 | 1 | 3 | 12 | 60 | -50°C/+60°C |
